By building type — Healthcare
There's no special "healthcare mode" — the same measured-value fields and functional tests that verify a chiller verify a negative-pressure isolation room just as well.
First project free · contractors always free · no card
Screenshot — a checklist section with a room-pressure measured-value field
The same measured-value field type that records a chiller's superheat records an isolation room's pressure differential — a real number, timestamped, not a pass/fail guess.
Screenshot — a pressure-differential reading recorded on a checklist
Each phase of a staged renovation runs as its own scope inside the project, with its own tracker completion and its own closeout timing — you're not blocked waiting on the whole building.
Screenshot — tracker filtered to one wing's equipment
Equipment goes in, and the trade that installed it fills the checklist section for it — measured values, not a tick.
Systems get run through the sequence. Step results are recorded live, not transcribed afterward from a clipboard.
Anything that fails gets logged where it happened, assigned to a trade, and tracked in a comment thread until it's marked closed.
The handover package assembles itself from what's already been submitted and approved — nothing re-typed.
| Evidence required | Produced by | Form it arrives in |
|---|---|---|
| Room pressure differential logged before occupancy | Measured-value checklist field | Checklist PDF export |
| Medical gas system pressure and purity test | Functional test step result | Functional test PDF |
| ICRA / infection-control sign-off | CxA signature on submission | Signed checklist PDF |
| Filtration verification, with photo evidence | Measured-value field + attached photo | Checklist PDF with embedded photos |
"—"
Air Handling Unit
Heat Exchanger
Domestic Hot Water Storage Tank
Browse the full template library — 17 real templates, all editable.
Not pre-built — but any of the 17 real templates can be cloned and extended with the specific measured values and sign-offs your project needs, the same generic mechanism behind every template in the library.
On BuildingCX's own self-hosted infrastructure, not resold from a third-party cloud platform — if your project has specific data-residency requirements, that's worth a direct conversation rather than assuming.
Yes — each phase of a project tracks and closes independently; nothing forces one project-wide closeout date.
Whoever has access to that project and section — a contractor sees their own trade's sections, the CxA and portal-linked owner see everything.
First project free · contractors always free · no card