By building type — Labs & education

Phase-by-phase readiness, building by building.

A campus renovation rarely finishes all at once. Track fume hood exhaust and lab pressurization the same way you'd track any other system, one building at a time.

First project free · contractors always free · no card

Screenshot — a fume-hood face-velocity reading on a functional test

Exhaust as a real system
Fume hoods and lab exhaust are equipment, tracked like any other.
One building at a time
Phase a multi-building campus as separate scopes.
Face velocity is a measured value
Not a pass/fail guess at the sash.
Facilities staff get the portal
Read-only, no login, revocable.
01A real measured value

Fume hood face velocity gets recorded, not eyeballed.

A functional test step records the actual reading against the sequence's target — the same discipline a chiller's superheat check gets, applied to lab exhaust.

Screenshot — a functional test step with a face-velocity reading

02Building by building

Phase a campus renovation without waiting on the whole thing.

Each building or wing runs as its own scope inside the project — its own tracker completion, its own closeout — so one delayed building doesn't hold up a finished one.

Screenshot — tracker filtered to a single building on a multi-building project

The same four phases, per building.

01

Pre-functional

Equipment goes in, and the trade that installed it fills the checklist section for it — measured values, not a tick.

02

Functional testing

Systems get run through the sequence. Step results are recorded live, not transcribed afterward from a clipboard.

03

Issue resolution

Anything that fails gets logged where it happened, assigned to a trade, and tracked in a comment thread until it's marked closed.

04

Closeout

The handover package assembles itself from what's already been submitted and approved — nothing re-typed.

What a lab or campus facilities team actually asks for.

Evidence requiredProduced byForm it arrives in
Fume hood face velocity meets the targetFunctional test step resultFunctional test PDF
TAB report for lab exhaust and makeup airTAB-trade checklist sectionChecklist PDF export
A handover package per building, not per campusPer-building closeout scopeOwner handover PDF

"—"

—
Replace with a real, attributable quote before launch.
—Metric TBD
—Metric TBD
—Metric TBD
—Metric TBD

Templates to start from

Questions about lab and education projects

Can we track fume hoods the same way as HVAC equipment?

Yes — a fume hood is an equipment tag with its own checklist and functional test like any other system; face velocity is just a measured-value field on it.

Can a multi-building campus close out in phases?

Yes — scope each building or wing separately inside the project so it can close out on its own timeline.

Do facilities staff need an account to check progress?

No — the read-only owner portal works the same way here: a revocable link, no login.

Is TAB (test, adjust, balance) tracked separately from mechanical?

Yes — TAB is its own trade scope on a checklist section, distinct from mechanical, electrical, or controls.